Keeping You Moving. Beyond Expectations.
We clear multi-building business park lots and connecting roads so Western Washington tenants reach work in winter.
Business parks in Edgewood need clear lots before the first employee or visitor pulls in. Washington Snow Removal plows and treats parking lots, walks and entrances at office properties across the city. We are licensed, bonded and insured.
Edgewood has 6 offices and office buildings on the map, including Allstate, Farmers Insurance, the Instructional Materials Processing Center and the Mountain View-Edgewood Water Company. Each has its own lot, walks and entrances to keep clear. Call 206-809-9669 to talk through your property.
Sources: NOAA and National Weather Service records for Edgewood, 2005–2026.
Edgewood averages 6.8 in of snow per season, and only about 2.1 days a year bring 1 in or more. An average season has 2.14 plow events. Snow here is infrequent, but it can be heavy. Since 2005 the biggest single day was 7.9 in. Storms in Feb 2019 (11.6 in total), Feb 2021 (10.8 in) and Jan 2012 (10.1 in) each lasted several days.
Ice is the more regular problem. Edgewood has 30 freezing nights between October and April. Wet pavement in a business park lot can freeze overnight, even when no snow fell.
For an office property, the work usually involves:
We dispatch from our Bothell yard, which is 66 minutes from Edgewood. Pricing is hourly with a 2-hour minimum per dispatch. A Ram 3500 plow truck with driver is $250 per hour, and a Ram 5500 plow and spreader truck is $325 per hour. A crew member for walks is $110 per person-hour. Bulk salt applied is $300 per ton. The trip charge for Edgewood is $350 per dispatch.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Edgewood (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Edgewood has 6 offices and office buildings on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Shared internal roads open first so tenants can circulate; each tenant lot is cleared to its own business hours; internal intersections are deiced against hidden refreeze; sequenced work matches varied tenant opening times; a single provider covers the entire multi-building campus