Keeping You Moving. Beyond Expectations.
When a heavy, wet Cascade snowfall piles up fast, our equipment handles the load your shovel cannot.
Federal Way does not get snow often. The average is 6.0 in per season, and only 1.8 days a year bring 1 in or more. When a heavy storm does arrive, though, the city is rarely set up for it. Washington Snow Removal clears heavy snowfall from lots, drives and walkways in Federal Way.
We are licensed, bonded and insured, and we dispatch from our Bothell yard, 60 minutes away. Rates are posted on this page so you know the cost structure before you call. To arrange service, call 206-809-9669.
Sources: NOAA and National Weather Service records for Federal Way, 2005–2026.
Heavy snow here is infrequent but real. Since 2005 there have been 15 winter storm and heavy snow reports, and the largest storm brought 13.7 in. Spotters measured 10.5 in near Federal Way on Dec 22, 2008, and 9.5 in on Feb 14, 2021. Days with 4 in or more average just 0.33 a year, and Winter Storm Warnings average 0.76 a year.
Because storms are rare, many properties have no plan and no equipment. Deep snow packs down fast under traffic, and the 28 freezing nights between October and April mean slush can turn to ice after dark.
On a heavy-snow job we typically use:
Federal Way is in zone B. The trip charge is $275 per dispatch, and each dispatch has a 2-hour minimum. Call 206-809-9669 to talk through your property.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Federal Way (zone B) | $275 / dispatch |
Prices approved Oct 2026.
Equipment matched to dense, wet regional snow; Fast removal of large accumulation volumes; Prevention of hard-packed, compacted layers; Reduced strain and risk versus manual shoveling; Capacity to handle a foot or more at once