Keeping You Moving. Beyond Expectations.
Clearing of on-property and campus bike lanes so year-round Puget Sound cyclists are not forced into traffic.
Bike lanes in Gig Harbor are narrow, and plowed snow from the road often ends up in them. Washington Snow Removal clears bike lanes in Gig Harbor with hand crews and a compact track loader, so riders and commuters have a usable lane after a storm.
Snow here is rare. The city averages 5.5 in per season and only 1.5 days a year with 1 in or more. When a big storm does arrive, the lanes can stay blocked until someone clears them. We are licensed, bonded and insured. Call 206-809-9669.
Sources: NOAA and National Weather Service records for Gig Harbor, 2005–2026.
Bike lane work is a mix of hand work and machine work. Crew members shovel and clear short stretches, edges and spots near curbs and driveways. A Kubota SCL1000 compact track loader with an operator moves heavier piles of snow pushed into the lane by road plows.
Gig Harbor's pattern shapes how we plan. Only 62% of winters have at least one 1-inch day, and just 1.0 day a year stays below freezing. But there are 31 freezing nights from October to April, and about 3.19 light-snow days a year need deicing. Thin snow can leave a slick film on a lane, even when there is little to shovel.
Large storms are the exception, and they matter. Since 2005 the biggest were:
Pricing is $110 per person-hour for crew members, $175 per hour for the loader with operator, and $45 per 50 lb bag of ice melt. Gig Harbor is in zone C, with a $350 trip charge per dispatch. There is a 2-hour minimum per dispatch. Our yard in Bothell is 84 minutes away.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Gig Harbor (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Keeps cyclists out of vehicle lanes during snow; Clears the full lane width without windrowing snow back; Treats shaded stretches prone to lingering black ice; Supports year-round bike commuting on your property