Keeping You Moving. Beyond Expectations.
We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Construction sites in Gig Harbor do not need snow often. Gig Harbor averages 5.5 in of snow per season and only 1.5 days a year with 1 in or more. But a single storm can stop work. Feb 9–12, 2019 brought 16.7 in in total, with 8.4 in on the biggest day.
Washington Snow Removal clears access roads, staging areas, laydown yards and walkways at active job sites. We are based in Bothell, licensed, bonded and insured. Call 206-809-9669 to set up a dispatch.
Sources: NOAA and National Weather Service records for Gig Harbor, 2005–2026.
A job site has different needs than a parking lot. Trucks, deliveries and crews need a clear path in, and workers need safe footing once they arrive. We plan the work around how your site is laid out.
Gig Harbor sees 31 freezing nights from October through April. That matters as much as snow. Meltwater and frost can leave slick gravel, plywood walkways and ramps even when little snow falls. Plow events average 1.48 per season, so most winters call for only a visit or two, but the larger storms since 2005 show the risk. Jan 15–20, 2012 totaled 11.9 in. Dec 21–22, 2008 totaled 6.7 in. Dec 26–28, 2021 totaled 4.7 in.
Gig Harbor is 84 minutes from our Bothell yard. Dispatches carry a $350 trip charge for Gig Harbor (zone C) and a 2-hour minimum. Plow trucks with a driver start at $250 per hour. Call 206-809-9669 for a quote based on your site.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Gig Harbor (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones