Keeping You Moving. Beyond Expectations.
Get rapid, on-call snow and ice response when an unexpected storm threatens to shut down your commercial property.
Snow in Kent is rare, but it does happen. The area averages 5.0 in per season and about 1.3 days a year with 1 in or more. When it lands on a lot, loading dock or entrance, the property still has to open. Washington Snow Removal dispatches plow trucks, loaders and hand crews for emergency commercial snow removal in Kent.
We are licensed, bonded and insured, and we work out of Bothell, 50 minutes from Kent. Call 206-809-9669 to request a dispatch. Rates are listed below, with a 2-hour minimum per dispatch.
Sources: NOAA and National Weather Service records for Kent, 2005–2026.
Emergency work in Kent is mostly about speed on a short list of tasks. Kent sees about 0.29 heavy-snow days a year (4 in or more) and 0.76 Winter Storm Warnings. The biggest single day since 2005 was 8.9 in, and the record is 11.0 in, set in 1950. Storms are infrequent, so most properties have no plan until one arrives.
A typical dispatch at a commercial property covers:
Ice matters as much as snow here. Kent logs about 30 freezing nights from October to April, and recent events include Heavy Snow on Nov 29, 2022, and Cold/Wind Chill on Dec 28, 2021, and Oct 28, 2023. Cold events can leave refreeze on pavement even without a big snowfall.
Kent is a zone B trip at $275 per dispatch. Each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Kent (zone B) | $275 / dispatch |
Prices approved Oct 2026.
Rapid mobilization for unexpected storms; Priority clearing of mission-critical access; Fast treatment of sudden hazardous surfaces; Reduced downtime and liability during surprise events