Keeping You Moving. Beyond Expectations.
Beet juice deicer application blends an agricultural byproduct with brine to melt ice at colder temperatures using less salt.
Beet juice deicer is a liquid applied to pavement before ice forms. In Lake Forest Park, that means driveways, walkways and parking areas get treated ahead of the freezing nights that make up much of the cold season. Washington Snow Removal serves the city from our Bothell yard, 18 minutes away.
We are licensed, bonded and insured. The area sees 30 freezing nights from Oct to Apr but only 1.7 days a year with 1 in or more of snow, so most of the risk is thin ice, not deep snow. Call 206-809-9669 to set up an application.
Sources: NOAA and National Weather Service records for Lake Forest Park, 2005–2026.
Lake Forest Park averages 5.3 in of snow per season. Big plowing days are rare. Frost, light snow and refreezing meltwater are the usual problems. About 2.52 light-snow days a year need deicing, and the area has 30 freezing nights from Oct to Apr.
Ice events do happen. An ice storm and freezing rain were reported on Dec 23, 2022, including reports near Mountlake Terrace and Kenmore. There have been 3 ice storm reports logged since 2005. Treating surfaces before that kind of event helps keep ice from bonding to the pavement.
At a typical property, an application involves:
Lake Forest Park's sidewalk rule, LFPMC 8.12.040(A), covers snow and ice left on public sidewalks. The deadline is a reasonable time after the snow and ice has ceased to be deposited. Treated walkways are easier to keep clear.
Pricing: the trip charge for Lake Forest Park (zone A) is $200 per dispatch, with a 2-hour minimum per dispatch. Crew members are $110 per person-hour. Call 206-809-9669 for details.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Trip charge for Lake Forest Park (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Extends brine’s effective range into colder temperatures; Cuts total chloride use by improving salt performance; Sticks to pavement better, resisting wash-off from drizzle; Draws on a renewable agricultural byproduct