Keeping You Moving. Beyond Expectations.
Deicer restocking keeps bagged and bulk products replenished across your site so no zone goes untreated mid-storm.
Deicer Restocking in Lake Forest Park means we refill the salt and ice melt your property uses during a freeze. Washington Snow Removal is based in Bothell, WA, 18 minutes from town. We are licensed, bonded and insured.
Lake Forest Park sees little snow, about 5.3 in per season. But it has 30 freezing nights from October to April. Ice storms and short cold snaps can use up a small supply fast. Restocking keeps walkways, steps and driveways ready before the next one arrives. Call 206-809-9669 to set up a visit.
Sources: NOAA and National Weather Service records for Lake Forest Park, 2005–2026.
Restocking is simple. We bring the product, fill your bins or storage, and apply salt where you need it. Most properties here are homes, small offices and shared entrances, so supplies are often kept in a bucket, bin or garage.
The local pattern shapes how much you need. Lake Forest Park averages 1.7 days a year with 1 in or more of snow and 4 days with snow on the ground. Only 1.2 days a year stay below freezing. Yet there are 30 freezing nights from October to April, and 3.33 Winter Weather Advisories a year. Recent events include a Winter Storm on Feb 12, 2021, and Winter Weather and an Ice Storm on Dec 19 and Dec 23, 2022. Ice, not deep snow, is usually the problem. Thin ice on steps and shaded walks needs deicer, not a plow.
The city sidewalk rule, LFPMC 8.12.040(A), covers snow and ice left on public sidewalks. It sets the deadline at a reasonable time after the snow and ice stops falling. Having product on hand makes that easier to meet.
Current pricing:
Billed by the hour for the crew and equipment on site, plus materials.
| Bulk salt, applied | $300 / ton |
| Ice melt, bagged | $45 / 50 lb bag |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Trip charge for Lake Forest Park (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Prevents mid-storm shortages at entrances and lots; Covers both bagged and bulk deicer inventory; Scheduled to match each site’s real usage pace; Frees property staff from tracking supply themselves