Keeping You Moving. Beyond Expectations.
Deicing of fire lanes to keep emergency access surfaces from glazing over after they have been plowed.
Fire lanes in Milton have to stay clear and ice-free so engines and medics can reach a building. Washington Snow Removal treats fire lanes at commercial and multi-unit properties in Milton, which sits across King County and Pierce County.
Milton averages 6.1 in of snow a season, but it sees 28 freezing nights between October and April. Washington Snow Removal is based in Bothell, is licensed, bonded and insured, and can be reached at 206-809-9669.
Sources: NOAA and National Weather Service records for Milton, 2005–2026.
A fire lane is a marked route along a building, often curbed, narrow and shaded. Ice there can sit unnoticed until a vehicle needs to use it. Our work focuses on keeping the full lane width treated, plus the areas around hydrants and the access points that connect to the lane.
Milton does not get much snow. It averages 1.9 days a year with 1 in or more, and snow is on the ground about 4 days a year. The bigger problem is ice. There are 28 freezing nights from October to April, and meltwater or rain refreezes on pavement overnight. Freezing rain has also hit the area, including the Jan 19, 2012 ice storm and a Dec 23, 2022 report at 1 S Federal Way.
A typical visit can include:
Each dispatch has a 2-hour minimum and a $350 trip charge for Milton (zone C). Our Bothell yard is 66 minutes away, so call 206-809-9669 to talk through your property.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Trip charge for Milton (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Prevents refreeze on plowed emergency-access lanes; Keeps fire lanes code-compliant and passable; Anti-ices ahead of forecast freezing conditions; Uses pavement- and drain-safe materials