Keeping You Moving. Beyond Expectations.
We mobilize fast when a Western Washington ice storm glazes your property in a hard, hazardous shell.
Ice storm response in Pacific covers the clearing and treating work that follows freezing rain, glazed pavement and packed snow. Pacific sits across the King County and Pierce County line, and Washington Snow Removal dispatches here from our Bothell yard, about 60 minutes away.
Pacific averages 6.5 in of snow a season and sees 28 freezing nights from October to April. Ice is a regular problem, and snow is the occasional one. We are licensed, bonded and insured. Call 206-809-9669 to set up a dispatch.
Sources: NOAA and National Weather Service records for Pacific, 2005–2026.
Most winters in Pacific bring few snow days. The city averages 2.1 days a year with 1 in or more of snow, and only 0.38 heavy-snow days a year at 4 in or more. But 28 freezing nights from October to April mean thin ice and refreeze are common, and a few big storms have hit. The largest since 2005 reached 12.8 in, and the biggest single day was 9.2 in. Nearby spotters reported 10 in at Auburn on Feb 9, 2019, and 8.1 in near Puyallup on Feb 6, 2017.
Because the pattern is uneven, response is built around the conditions on the day. A typical dispatch can include:
Pricing is posted so you can plan. A Ram 3500 plow truck with driver is $250 per hour. A Ram 5500 plow and spreader truck is $325 per hour. A crew member is $110 per person-hour. Bulk salt applied is $300 per ton, and bagged ice melt is $45 per 50 lb bag. Pacific is trip zone B, with a $275 charge per dispatch. Each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Pacific (zone B) | $275 / dispatch |
Prices approved Oct 2026.
Fast dispatch during active glazing conditions when traction disappears; Deicer chemistry chosen to break the ice-to-pavement bond instead of scraping over it; Priority treatment of high-traffic entrances to cut fall risk; Coordination with limb and debris clearing common to regional ice events