Keeping You Moving. Beyond Expectations.
Clearing and anti-icing of pedestrian and vehicle bridge decks that freeze before any road surface around them.
Bridge decks in Redmond freeze before the roads around them. Air moves above and below the deck, so a freezing night can leave a thin glaze on a pavement that looks fine on the approach. Washington Snow Removal clears and treats bridge decks, private and shared, from our base in Bothell.
Redmond sees about 7.8 in of snow in an average season, and 31 freezing nights between October and April. We are licensed, bonded and insured. Call 206-809-9669 to talk through your deck.
Sources: NOAA and National Weather Service records for Redmond, 2005–2026.
Most Redmond snow is light. Snow sits on the ground about 6 days a year, and only about 2.3 days bring 1 in or more. Plowing starts at 1 inch of accumulation. The bigger recurring problem on a deck is ice, not depth.
A typical visit can include:
About 3.19 light-snow days a year need deicing. With 31 freezing nights from October to April, a deck can ice up with no snow at all. That is why many owners add the ice plan, from $325 per season. A single deicing application is from $85 per visit.
Big storms do happen. Redmond logged 11.2 in over Feb 11-13, 2019, and 10.3 in over Dec 18-19, 2008. Those events call for clearing in stages rather than once.
Pricing for bridge decks depends on size and access, so call 206-809-9669 for a quote. Our seasonal plans are priced from Redmond's snow history, and visits beyond a plan's limit are half the per-visit price.
Starting prices for Redmond. Final price depends on size, slope and snow depth. Redmond is in travel zone A.
| Two-car driveway incl. front walk and steps, per visit | from $275 |
| Single-car driveway incl. front walk and steps, per visit | from $185 |
| Deicing application, per visit | from $85 |
| Seasonal plan, two-car (up to 5 visits) | from $755 |
| Seasonal plan, single-car (up to 5 visits) | from $510 |
| Ice plan add-on, per season | from $325 |
Prices approved Oct 2026.
Addresses the surface that freezes first in any cold event; Applies anti-icing ahead of freezing-rain glaze; Protects deck structure with appropriate materials; Guards water quality beneath the span