Keeping You Moving. Beyond Expectations.
We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Construction sites in Redmond keep working through the winter, and a few inches of snow can stop access for trucks, deliveries and crews. Washington Snow Removal clears haul routes, staging areas, gate entries and walkways so work can continue safely. We are licensed, bonded and insured.
We dispatch from our Bothell yard, which is 27 minutes from Redmond. Redmond averages 7.8 in of snow per season, so storms are short and uneven. Call 206-809-9669 to set up service for your site.
Sources: NOAA and National Weather Service records for Redmond, 2005–2026.
A job site is not a parking lot. Ground is often rough, materials sit in the way, and equipment moves all day. We plan the clearing around how your site actually works.
Typical work on a Redmond site includes:
Redmond sees about 2.3 days a year with 1 in or more of snow, and our average season has 2.29 plow events. Most storms are small. But the area can get more. The biggest single day since 2005 was 7.9 in, and spotters near Redmond reported 9 in on Dec 18, 2008. Heavy events like that can bury a site fast.
Ice is the more regular problem. Redmond has 31 freezing nights from October to April, so melted snow and wet ground refreeze on ramps, gravel transitions and walkways before the morning shift starts.
Rates are $250 per hour for the Ram 3500, $325 per hour for the Ram 5500 with spreader, $175 per hour for the loader and $110 per person-hour for crew members. Redmond has a $200 trip charge per dispatch, and each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Redmond (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones