Keeping You Moving. Beyond Expectations.
Evening and overnight clearing that readies your property before the next business day begins.
After-Hours Snow Removal in Renton covers the nights, early mornings and weekends when a lot needs to be clear before people arrive. Washington Snow Removal is licensed, bonded and insured, and works out of our yard in Bothell, 37 minutes from Renton.
Renton averages 5.8 in of snow per season, so big storms are uncommon. When one hits, timing matters. Call 206-809-9669 to set up a dispatch. Rates are listed by the hour, with a 2-hour minimum per dispatch and a $275 trip charge for Renton (zone B).
Sources: NOAA and National Weather Service records for Renton, 2005–2026.
After-hours work means we plow, shovel and treat surfaces outside normal business hours. In Renton that usually means clearing parking lots, entrances and sidewalks overnight so a site can open on time.
The local pattern shapes the job. Renton sees only 1.9 days a year with 1 in or more of snow, and the biggest single day since 2005 was 8.0 in. Kent set a daily record of 11.0 in in 1950. Still, there have been 15 winter storm and heavy snow reports since 2005, and about 0.76 Winter Storm Warnings a year. Recent events include Winter Weather on Feb 4, 2025, Cold/Wind Chill on Jan 12, 2024, and Winter Weather on Dec 19, 2022.
Ice is the more common problem. Renton has 29 freezing nights between October and April, so wet pavement can freeze after dark even when no snow falls. Salt or ice melt is often the right call.
Pricing for a dispatch:
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Renton (zone B) | $275 / dispatch |
Prices approved Oct 2026.
Clearing completed before the next business day; work done while lots sit empty and accessible; counters the overnight freeze that peaks at dawn; keeps morning openings safe and on time; no disruption to daytime operations