Keeping You Moving. Beyond Expectations.
Keep industrial yards, truck lanes, and employee access open and productive through Western Washington winter weather.
Seattle gets little snow, but industrial sites feel it fast. The city averages 5.3 in of snow per season and sees 1.6 days a year with 1 in or more. When a storm does hit, yards, docks and loading lanes need to be cleared quickly.
Washington Snow Removal is licensed, bonded and insured. We work from our Bothell yard, 37 minutes from Seattle, and plow, spread and hand-clear industrial lots, walks and entrances. Call 206-809-9669 to set up service.
Sources: NOAA and National Weather Service records for Seattle, 2005–2026.
Seattle has 191 industrial sites on our map, from marine terminals like Alaska Marine Lines to metal yards like All Metal Co. Each has lots, walkways and entrances that must stay open for trucks and staff.
Work at these sites usually includes:
Seattle's pattern is infrequent but sharp. Since 2005 there have been 15 winter storm and heavy snow reports. The biggest was Feb 12-15, 2021, with 13.0 in total and 8.7 in on the biggest day. Dec 2008 brought 7.5 in, and Feb 2019 brought 6.8 in. Most winters bring far less, yet the area sees 27 freezing nights from October to April. Those nights make ice a bigger routine risk on wet pavement than snow depth.
Rates are $250 per hour for the Ram 3500 plow truck and $325 per hour for the Ram 5500 plow and spreader. The Kubota loader is $175 per hour. Crew members are $110 per person-hour. Bulk salt is $300 per ton applied, and bagged ice melt is $45 per 50 lb bag. Seattle is zone B, with a $275 trip charge per dispatch and a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Seattle (zone B) | $275 / dispatch |
Prices approved Oct 2026.
Seattle has 191 industrial sites on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Clear truck lanes and yard access for freight; Large-area clearing with properly sized equipment; Sanded routes for forklift and trailer traffic; Minimal downtime for shipping and receiving