Keeping You Moving. Beyond Expectations.

What Would You Like To Find?

Shoreline Manufacturing Plant Snow Removal

Manufacturing Plant Snow Removal in Shoreline, King County, WA - Keep raw materials arriving and finished goods shipping by having your plant's shipping yards, employee lots, and pedestrian...

Keep raw materials arriving and finished goods shipping by having your plant’s shipping yards, employee lots, and pedestrian routes cleared before each shift.

Washington Snow Removal clears snow and ice at manufacturing plants in Shoreline, King County. We are licensed, bonded and insured, and we work out of our Bothell yard, 22 minutes from Shoreline.

Shoreline averages 5.8 in of snow per season, so big storms are rare. Freezing nights are not. There are 33 of them from October to April. We plow lots and drive lanes, shovel entrances, and spread ice melt where plant traffic needs safe footing. Call 206-809-9669 to set up service.

Shoreline winter workload for property managers

3.28light-snow days that need deicing
7.0 inbiggest single day since 2005
15winter storm and heavy snow reports since 2005
5.8 inaverage snowfall per season

Average snowfall by month in Shoreline

0.3"Nov
1.6"Dec
0.9"Jan
2.7"Feb
0.2"Mar

Largest snow totals reported near Shoreline

  • Feb 13–14, 2021: Up to 10 in, 8 spotter reports: 4 S Shoreline 10 in, Brier 9.5 in, 1 SE Alderwood Manor 9.3 in, 3 SSW Sheridan Beach 9 in, 4 S Shoreline 9 in, Lynnwood 9 in, 1 S Sheridan Beach 8.8 in, Lynnwood 8 in
  • Feb 8–12, 2019: 15.2 in total, 6.0 in on the biggest day
  • Jan 14–20, 2012: 8.8 in total, 3.0 in on the biggest day

Sources: NOAA and National Weather Service records for Shoreline, 2005–2026.

How Shoreline's Snow Pattern Shapes Plant Snow Removal

A manufacturing plant has needs that a typical lot does not. Trucks come and go at loading docks. Employees cross lots between shifts. Entrances and walkways have to stay clear and not icy. Shoreline has 9 industrial sites mapped, so plants here share the area with maintenance yards and utility facilities.

Local weather matters for planning. Shoreline sees only 1.7 days a year with 1 in or more of snow. Light-snow days that need deicing run about 3.28 a year. Since 2005 there have been 15 winter storm and heavy snow reports, and the biggest single day was 7.0 in. On Feb 13, 2021, a spotter at 4 S Shoreline measured 10 in. A plant needs a plan for both the small icy mornings and the rare heavy storm.

  • Plow truck with driver (Ram 3500): $250 / hour
  • Plow and spreader truck with driver (Ram 5500): $325 / hour
  • Compact track loader with operator (Kubota SCL1000): $175 / hour
  • Crew member for shoveling and sidewalks: $110 / person-hour
  • Ice melt, bagged: $45 / 50 lb bag
  • Bulk salt, applied: $300 / ton

The trip charge for Shoreline (zone A) is $200 per dispatch. Each dispatch has a 2-hour minimum.

Prices in Shoreline

Billed by the hour for the crew and equipment on site, plus materials.

Plow truck with driver (Ram 3500)$250 / hour
Plow and spreader truck with driver (Ram 5500)$325 / hour
Compact track loader with operator (Kubota SCL1000)$175 / hour
Crew member (shoveling, sidewalks, hand work)$110 / person-hour
Ice melt, bagged$45 / 50 lb bag
Bulk salt, applied$300 / ton
Trip charge for Shoreline (zone A)$200 / dispatch
  • 2-hour minimum per dispatch.
  • Shoreline is 22 minutes from our Bothell yard.

Prices approved Oct 2026.

Industrial sites in Shoreline

There are 9 industrial sites mapped within Shoreline.

  • Hamlin Maintenance Yard, City of Shoreline
  • North City Water District Maintenance Facility
  • North City Water District Water Tower
  • North Maintenance Yard, City of Shoreline

Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.

Manufacturing Plant Snow Removal in Shoreline, King County, WA - Shipping and receiving yards open for inbound freight

Service Area

Shoreline

County: King County
ZIP Codes Served: 98133, 98155, 98177
Neighborhoods: Richmond Beach, Echo Lake, North City
Nearby Communities: Seattle, Lake Forest Park, Edmonds, Mountlake Terrace

Benefits

Shipping and receiving yards open for inbound freight; Forklift and yard-transfer routes kept passable; Employee lots cleared ahead of early shift arrivals; Sanded pedestrian crossings to reduce worker injuries; Scheduling aligned to your shift-change windows

Manufacturing Plant Snow Removal in Shoreline, King County, WA - Map shipping yards, inter-building routes, and worker lots

Manufacturing Plant Snow Removal in nearby areas

Ready to get started?

Get a shift-aligned quote to keep your production schedule on track this winter.
Call: 206-809-9669

Get a Manufacturing Plant Snow Removal Quote in Shoreline

Contact Form New

By providing your phone number and submitting this form, you agree to receive transactional text messages from Washington Snow Removal regarding your inquiry, estimates, appointment scheduling, appointment reminders, service updates, and customer support communications. Message frequency may vary. Standard Message and Data Rates may apply. Reply STOP to opt out. We will not share mobile information with third parties for promotional or marketing purposes. Please review our Privacy Policy and Terms & Conditions.