How Snow Relocation Works in Steilacoom, WA
Steilacoom averages 4.7 in of snow per season and only 1.6 days a year with 1 in or more. Plow events are few, about 1.58 in an average season. When snow does come, it can arrive in a heavy burst. The Dec 21–22, 2008 storm brought 6.5 in total, with 3.8 in on the biggest day. Jan 11, 2007 dropped 4.5 in in a single day.
Because storms are rare, most properties have little planned space for snow. Piles from plowing can crowd lots, entries and walkways. Relocation clears that space.
Freezing nights matter too. Steilacoom sees 37 between Oct and Apr, so leftover piles can melt by day and refreeze at night. Moving snow away from drive lanes and drainage points helps limit ice. About 2.63 light-snow days a year also need deicing.
What we use and what it costs:
- Compact track loader with operator (Kubota SCL1000): $175 / hour
- Plow truck with driver (Ram 3500): $250 / hour
- Plow and spreader truck with driver (Ram 5500): $325 / hour
- Trip charge for Steilacoom (zone D): $525 / dispatch
Each dispatch has a 2-hour minimum. Steilacoom is 89 minutes from our Bothell yard, which is reflected in the trip charge.