Keeping You Moving. Beyond Expectations.
We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Construction sites in Tukwila keep working through the cold months, and a little snow can still stop a delivery or close a haul road. Washington Snow Removal clears snow and ice from active job sites, from access roads and laydown yards to walkways and staging areas.
We are based in Bothell, 46 minutes from Tukwila, and we are licensed, bonded and insured. Tukwila averages 5.4 in of snow per season, so most winters call for a few short, focused visits. Call 206-809-9669 to talk through your site.
Sources: NOAA and National Weather Service records for Tukwila, 2005–2026.
A job site is not a parking lot. Surfaces are often gravel or bare dirt, equipment is parked in odd places, and crews and trucks need clear paths early in the day. We plow gate entrances, haul routes and laydown areas, and use hand crews for stairs, walkways and tight spots near the work.
Tukwila's snow pattern is light but irregular. The average season brings 1.81 plow events and only 1.8 days with 1 in or more of snow. The area also sees 2.62 light-snow days that need deicing and 26 freezing nights from October to April. That means ice on ramps, plates and walking surfaces is often a bigger issue than deep snow. Bigger storms do happen. The biggest single day since 2005 was 7.4 in, and spotters near Tukwila reported 7.5 in at Renton on Feb 13, 2021.
Each dispatch has a 2-hour minimum and a $275 trip charge for Tukwila (zone B).
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Tukwila (zone B) | $275 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones