Keeping You Moving. Beyond Expectations.
Clearing of tight urban and residential alleyways that plows cannot easily reach but tenants and trucks still depend on.
Alleys in Woodinville are tight. Plowed snow has few places to go, and a narrow lane can close up fast after a storm. Washington Snow Removal clears alleyways for businesses and residents in Woodinville. We work from our Bothell yard, 17 minutes away.
We are licensed, bonded and insured. Woodinville averages 8.8 in of snow per season, with about 2.7 days a year at 1 in or more. Call 206-809-9669 to talk through your alley and what it needs.
Sources: NOAA and National Weather Service records for Woodinville, 2005–2026.
An alley job differs from a parking lot job. The lane is narrow, often lined with garages, dumpsters and back doors. We pick equipment to fit. A Ram 3500 plow truck suits many alleys. A Kubota SCL1000 compact track loader can handle tighter spots and move piled snow. Crew members shovel around doors, steps and gates.
Woodinville does not get snow often. An average season has 2.71 plow events and 1.05 Winter Storm Warnings a year. But the big events can be heavy. Spotters reported 10.5 in near Woodinville on Feb 9, 2019, and 10.3 in on Feb 14, 2021. Snow that melts by day and refreezes is also a concern, since the area sees 32 freezing nights from Oct to Apr.
Typical tasks for an alley include:
Pricing is hourly. A Ram 3500 with driver is $250 per hour, and a compact track loader with operator is $175 per hour. Crew members are $110 per person-hour. Bagged ice melt is $45 per 50 lb bag, and bulk salt applied is $300 per ton. Woodinville has a trip charge of $200 per dispatch, with a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Woodinville (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Reaches tight spaces that full-size plows cannot service; Keeps dumpster and delivery access open behind businesses; Protects fences, gates, and meters from equipment damage; Treats sloped alleys against runoff refreeze