Keeping You Moving. Beyond Expectations.
Gentle snow clearing of wood and composite boardwalks where blades and harsh deicers would damage the decking.
Boardwalks in Woodinville get slick fast. Wood decking holds frost, and a thin layer of snow can turn to ice on a freezing night. Washington Snow Removal clears boardwalks by hand, with crews dispatched from our Bothell yard, 17 minutes away.
We are licensed, bonded and insured. Boardwalk work is mostly shovel and ice melt work, so we send crew members rather than heavy equipment. Call 206-809-9669 to set up a dispatch. Pricing is listed below, with a 2-hour minimum per dispatch.
Sources: NOAA and National Weather Service records for Woodinville, 2005–2026.
Boardwalk clearing is detailed hand work. Crew members shovel the walking surface, work along rails and steps, and clear around benches and entries. Then we spread bagged ice melt where ice can form. We avoid hard scraping on decking where we can.
Woodinville does not get much snow. The average is 8.8 in per season, and only 2.7 days a year bring 1 in or more. But 76% of winters have at least one 1-inch day, and the area logs about 32 freezing nights from Oct to Apr. On average, 3.1 light-snow days need deicing. That means ice is often the bigger problem than depth.
Recent events logged for the area include Feb 4, 2025 (Winter Weather), Dec 1, 2022 (Winter Weather), Feb 5, 2017 (Heavy Snow) and Feb 8, 2014 (Heavy Snow).
If your boardwalk abuts a public sidewalk, note Woodinville code WMC 12.06.020. The owner must keep the sidewalk safe and free of obstructions, including ice and snow, at all times.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Woodinville (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Protects wood and composite decking from blade damage; Avoids chloride deicers that corrode fasteners; Keeps plank gaps clear for drainage; Uses sand or grit that will not contaminate the water below