Keeping You Moving. Beyond Expectations.
We mobilize fast when a Western Washington ice storm glazes your property in a hard, hazardous shell.
Ice storms in Woodinville are not like snow events. Freezing rain glazes driveways, parking lots, walkways and steps, and a thin layer can make a surface unsafe. Washington Snow Removal responds to these events from our Bothell yard, 17 minutes away. We are licensed, bonded and insured.
Our ice storm response covers plowing where there is snow under the ice, salt and ice melt application, and hand work on sidewalks and entries. Call 206-809-9669 to set up a dispatch. Rates are listed below, with a 2-hour minimum per dispatch.
Sources: NOAA and National Weather Service records for Woodinville, 2005–2026.
Woodinville gets an average of 8.8 in of snow a season and only 2.7 days a year with 1 in or more. Freezing nights are far more common. There are 32 between October and April. That means ice is often the bigger problem, and a few inches of snow can arrive on top of it. The area has had 27 winter storm and heavy snow reports since 2005, and the biggest single day was 7.4 in. A spotter in Woodinville measured 9.5 in on Feb 4, 2019.
On an ice call, the work usually follows this order:
The trip charge for Woodinville (zone A) is $200 / dispatch. The 2-hour minimum applies to each dispatch. With about 4.29 Winter Weather Advisories a year, it helps to call before the freezing rain starts.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Woodinville (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Fast dispatch during active glazing conditions when traction disappears; Deicer chemistry chosen to break the ice-to-pavement bond instead of scraping over it; Priority treatment of high-traffic entrances to cut fall risk; Coordination with limb and debris clearing common to regional ice events