Keeping You Moving. Beyond Expectations.
Evening and overnight clearing that readies your property before the next business day begins.
Snow in Yarrow Point does not keep office hours. Washington Snow Removal offers after-hours snow removal for Yarrow Point properties, including nights, early mornings and weekends, so driveways and walkways can be cleared before you need them.
We are a licensed, bonded and insured company based in Bothell, WA. Yarrow Point is 25 minutes from our Bothell yard. Call 206-809-9669 to talk through your property and set up a dispatch. Pricing is listed by the hour, with a 2-hour minimum per dispatch.
Sources: NOAA and National Weather Service records for Yarrow Point, 2005–2026.
Yarrow Point averages 5.4 in of snow per season. Only about 1.7 days a year bring 1 in or more, and heavy-snow days of 4 in or more come around 0.17 times a year. Most winters are quiet. The storms that do arrive can be large. Since 2005 the biggest was Dec 18–22, 2008, with 12.1 in total. Feb 8–12, 2019 brought 10.1 in, with 4.5 in on the biggest day.
Because snow is rare, few residents keep equipment on hand. Freezing nights are more common, at 28 between October and April. Ice on steep driveways and shaded walks can form overnight, even without a storm. After-hours service covers both cases.
A typical visit may include:
The trip charge for Yarrow Point (zone A) is $200 / dispatch. A compact track loader with operator is $175 / hour for tighter spaces. Each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Yarrow Point (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Clearing completed before the next business day; work done while lots sit empty and accessible; counters the overnight freeze that peaks at dawn; keeps morning openings safe and on time; no disruption to daytime operations