Keeping You Moving. Beyond Expectations.
We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Washington Snow Removal clears snow and ice from construction sites in Yarrow Point, King County. We work out of our Bothell yard, 25 minutes away. The company is licensed, bonded and insured.
Yarrow Point averages 5.4 in of snow per season, and only 1.7 days a year bring 1 in or more. Even so, a thin layer on a active site slows deliveries and makes ramps, access roads and walkways unsafe. Call 206-809-9669 to set up a dispatch.
Sources: NOAA and National Weather Service records for Yarrow Point, 2005–2026.
A construction site needs clear ground before work can start. Our crews plow access roads and staging areas, open gate and delivery routes, and shovel sidewalks, stairs and hand-work areas that a truck cannot reach. We spread salt or ice melt where crews and vehicles will walk and drive.
Yarrow Point does not get much snow, but ice is the bigger issue. The area has 28 freezing nights between October and April and about 3.22 light-snow days a year that need deicing. Most calls are for a skim of snow or frost on slick surfaces, not deep plowing. Big events do happen. The biggest single day since 2005 was 7.1 in, and the area has about 1.05 Winter Storm Warnings a year. Recent logged events include Feb 5, 2017 (Heavy Snow), Feb 12, 2021 (Winter Storm) and Feb 4, 2025 (Winter Weather).
Rates for Yarrow Point (zone A):
Each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Yarrow Point (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones