Keeping You Moving. Beyond Expectations.
We clear the deep drifts that wind piles against your buildings, gates, and driveways during a storm.
Snow drift removal in Bellevue means clearing wind-packed piles that block driveways, entries, loading areas and walkways. Drifts often form against buildings, fences and garage doors, so a light snowfall can still leave a heavy pile in one spot.
Washington Snow Removal sends crews from our Bothell yard, 31 minutes from Bellevue. We are licensed, bonded and insured. Call 206-809-9669 to talk through your property and book a dispatch. Rates are listed on this page, and each dispatch has a 2-hour minimum.
Sources: NOAA and National Weather Service records for Bellevue, 2005–2026.
Bellevue averages 7.2 in of snow per season and sees 2.1 days a year with 1 in or more. Heavy-snow days of 4 in or more are rare, at 0.43 a year. But when a storm hits, totals can climb. On Feb 14, 2021, spotters measured 12 in at 1 S Mercer Island and 11.5 in at 1 S Bellevue.
Because storms are infrequent, many properties have no plan for deep or drifted snow. Bellevue also has 30 freezing nights from Oct to Apr, so cleared snow left at the edges can refreeze into hard ice.
What a drift job usually involves:
Pricing is by equipment and time. A Ram 3500 plow truck with driver is $250 per hour. A Kubota SCL1000 compact track loader with operator is $175 per hour. A crew member is $110 per person-hour. Bagged ice melt is $45 per 50 lb bag, and bulk salt applied is $300 per ton. The Bellevue trip charge is $200 per dispatch, with a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Bellevue (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Targeted clearing of wind-built drifts; Restored access at gates and driveway ends; Attention to spots that repeatedly drift over; Equipment capable of cutting deep piles; Fewer surprise blockages during a windy storm