Keeping You Moving. Beyond Expectations.
We evaluate roof snow loads so you know whether accumulation has reached a dangerous weight.
A snow load assessment looks at how much weight snow is putting on a roof or structure in Carbonado. Washington Snow Removal is based in Bothell, WA, and is licensed, bonded and insured. Carbonado is 93 minutes from our Bothell yard.
Snow here is not frequent. Records near Carbonado are limited, so the figures on this page are approximate. Still, a single storm can bring a lot at once. The biggest storm since 2005 left 14.5 in on Feb 6, 2017. Call 206-809-9669 to talk through your property.
Sources: NOAA and National Weather Service records for Carbonado, 2005–2026.
An assessment starts with the building. We look at the roof type, the pitch, flat or low-slope areas, and places where snow can drift or pile up, such as valleys and below higher roof lines. We also note how much snow is on the roof and how dense it is.
Carbonado averages about 6.9 in of snow per season, and only about 2.8 days a year bring 1 in or more. Days with 4 in or more are rare, at about 0.17 a year. That means many roofs go years without much load. Then a big event arrives. The snowiest season, 2010-11, reached about 24.3 in. Three storms stand out since 2005:
There are also about 46 freezing nights from October to April. Cold nights keep snow from melting off and can turn a thaw into ice on edges and gutters. All of these numbers are approximate.
If the assessment shows snow that needs to come off, hand work is billed at $110 per person-hour for a crew member. Carbonado is in zone D, with a trip charge of $525 per dispatch.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Trip charge for Carbonado (zone D) | $525 / dispatch |
Prices approved Oct 2026.
Real weight data instead of guessing from snow depth; Recognition of how heavy saturated Northwest snow truly is; Clear guidance on whether removal is needed; Early warning before a load threatens the structure