Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial Facility Sidewalk Clearing in Carbonado covers the walkways that workers, drivers and visitors use to get from parking to the door. OpenStreetMap lists 2 industrial sites inside city limits, including the Carbonado Stockpile Site and the Wastewater Treatment Lagoon.
Washington Snow Removal is licensed, bonded and insured. We dispatch from our Bothell yard, which is 93 minutes from Carbonado. Call 206-809-9669 to talk through your site and set up service.
Sources: NOAA and National Weather Service records for Carbonado, 2005–2026.
Snow is not an everyday problem in Carbonado. Records nearby are limited, so treat these figures as approximate: about 6 days a year with snow on the ground, 2.8 days with 1 in or more, and an average of 6.9 in per season. The bigger issue is ice. The area sees about 46 freezing nights from October to April, so wet walkways can glaze over with no snow at all.
Big storms do happen. Since 2005, the biggest was Feb 6, 2017, at roughly 14.5 in. Others include Jan 15–20, 2012 (13.9 in), Dec 1–2, 2022 (12.1 in) and Feb 11–13, 2019 (12.0 in). Those storms are why a site plan matters even in a light snow area.
At an industrial site, the work usually includes:
Pricing is $110 per person-hour for crew members, $175 per hour for a Kubota SCL1000 compact track loader with operator, and $45 per 50 lb bag of ice melt. The Carbonado trip charge (zone D) is $525 per dispatch, with a 2-hour minimum per dispatch.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Carbonado (zone D) | $525 / dispatch |
Prices approved Oct 2026.
OpenStreetMap lists 2 industrial sites inside Carbonado city limits.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages