Keeping You Moving. Beyond Expectations.
Keep raw materials arriving and finished goods shipping by having your plant’s shipping yards, employee lots, and pedestrian routes cleared before each shift.
Washington Snow Removal clears snow and ice at manufacturing plants in Carbonado, Pierce County. We are licensed, bonded and insured, and we work from our Bothell yard, 93 minutes away. Plant lots, truck routes, walkways and entrances all need to stay usable when snow arrives.
Carbonado sees about 6.9 in of snow in an average season, though records near town are limited, so treat that figure as approximate. Call 206-809-9669 to talk through your site and how we would plan for it.
Sources: NOAA and National Weather Service records for Carbonado, 2005–2026.
A manufacturing plant has more to clear than a typical lot. Employee parking, shipping and receiving areas, loading docks and pedestrian walks all need attention. Carbonado has 2 industrial sites on the map, including the Carbonado Stockpile Site and the Wastewater Treatment Lagoon, each with lots, walks or entrances to keep clear.
Snow here is infrequent but can be heavy. Carbonado gets roughly 2.8 days a year with 1 in or more, and 46 freezing nights between October and April. Light-snow days needing deicing average about 1.0 a year. Since 2005 there have been 27 winter storm and heavy snow reports. The biggest storm, on Feb 6, 2017, brought about 14.5 in in one day. Dec 1-2, 2022 brought about 12.1 in, and Nov 21-23, 2010 about 12.0 in. All figures are approximate.
Depending on the site, a visit may include:
Rates are $250 to $325 per hour for trucks, with a 2-hour minimum per dispatch and a $525 trip charge for Carbonado.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Carbonado (zone D) | $525 / dispatch |
Prices approved Oct 2026.
Carbonado has 2 industrial sites on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Shipping and receiving yards open for inbound freight; Forklift and yard-transfer routes kept passable; Employee lots cleared ahead of early shift arrivals; Sanded pedestrian crossings to reduce worker injuries; Scheduling aligned to your shift-change windows