Keeping You Moving. Beyond Expectations.
Keep raw materials arriving and finished goods shipping by having your plant’s shipping yards, employee lots, and pedestrian routes cleared before each shift.
Washington Snow Removal clears snow and ice from manufacturing plant lots, truck courts, walkways and entrances in Federal Way, WA. We are based in Bothell and are licensed, bonded and insured. Federal Way is 60 minutes from our yard.
Federal Way averages 6.0 in of snow per season and sees 1 in or more on about 1.8 days a year. Those days are rare, but a plant still has shifts to run and trucks to receive. Call 206-809-9669 to talk through your site and how we would plan the work.
Sources: NOAA and National Weather Service records for Federal Way, 2005–2026.
A manufacturing plant has more to clear than a typical lot. Employee parking, shipping and receiving docks, truck turnaround areas, gate entrances and walkways to the door all need attention. Federal Way has 29 industrial sites on the map, including Campus Park, Corliss Resources and Ninth Avenue Center, and each has its own mix of lots, walks and entrances.
Snow is infrequent here, but it can arrive hard. The biggest single day since 2005 was 7.1 in, on Feb 12-15, 2021, when the storm totaled 8.5 in. The Jan 15-20, 2012 storm brought 13.7 in over several days. Winter Storm Warnings average 0.76 a year, so most seasons bring little warning.
Ice is the more regular problem. Federal Way has 28 freezing nights from Oct to Apr, and meltwater can refreeze on docks and walkways. That is where salt or ice melt matters.
Typical equipment and rates for a plant:
Each dispatch has a 2-hour minimum and a $275 trip charge for Federal Way (zone B).
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Federal Way (zone B) | $275 / dispatch |
Prices approved Oct 2026.
Federal Way has 29 industrial sites on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Shipping and receiving yards open for inbound freight; Forklift and yard-transfer routes kept passable; Employee lots cleared ahead of early shift arrivals; Sanded pedestrian crossings to reduce worker injuries; Scheduling aligned to your shift-change windows