Keeping You Moving. Beyond Expectations.
We install measurement snow stakes so you and our crew can verify accumulation depth and trigger service at the right moment.
Snow stakes mark the edges of driveways, parking areas, walkways and landscape beds before the snow falls. Washington Snow Removal installs them for Mercer Island properties so plow and shovel crews can see where the pavement ends and the planting begins.
Mercer Island averages 5.5 in of snow per season, so a stake that is missing or leaning matters when a storm does arrive. We are based in Bothell, licensed, bonded and insured. Call 206-809-9669 to set up an installation visit before the next freeze.
Sources: NOAA and National Weather Service records for Mercer Island, 2005–2026.
Stake installation is hand work. A crew walks the property, finds the edges that get buried, and sets stakes along them. Typical spots include driveway sides, curb returns, steps, drains and the borders of lawn and garden beds.
On Mercer Island, snow is occasional but it can be heavy. The island sees about 1.9 days a year with 1 in or more of snow, and 28 freezing nights between October and April. The biggest day since 2005 brought 8.5 in. Storms like Dec 21–22, 2008 (8.3 in total) and Feb 3–5, 2019 (6.6 in total, 5.4 in on the biggest day) left edges hard to read. With only 0.76 Winter Storm Warnings a year, many owners are not set up when one hits, so stakes go in ahead of time.
Pricing follows our posted rates. Crew time is $110 per person-hour, and the trip charge for Mercer Island (zone A) is $200 per dispatch. Our Bothell yard is 35 minutes away.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Trip charge for Mercer Island (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Provides objective accumulation readings for trigger-based contracts; Accounts for hyperlocal convergence-zone snowfall differences; Supports transparent, dispute-free service billing; Helps you decide when a push is genuinely needed