Keeping You Moving. Beyond Expectations.
We clear snow from solar arrays to restore energy production and protect the panels from damage.
Solar panels on Mercer Island homes and small buildings do not see much snow. The city averages 5.5 in per season and has snow on the ground about 3 days a year. When a storm does hit, a layer on the array can stop production until it clears.
Washington Snow Removal is based in Bothell, WA, and is licensed, bonded and insured. We clear snow from solar panels by hand and keep the work gentle on the glass and frames. Call 206-809-9669 to set up a visit.
Sources: NOAA and National Weather Service records for Mercer Island, 2005–2026.
Clearing solar panels is careful hand work. A crew member uses soft tools made for glass and works from the ground or a safe position. We do not scrape, chip or pour hot water on the panels. Ice that is bonded to the surface is better left to melt than forced off.
Mercer Island snow is rare but can be sudden. Only 1.9 days a year bring 1 in or more, and heavy-snow days of 4 in or more average 0.33 a year. Still, the largest storm since 2005 reached 12.9 in, and the biggest single day was 8.5 in. On Feb 14, 2021, a spotter at 1 S Mercer Island measured 12 in. An array can go from clear to buried in one event.
Freezing nights matter too. The island sees 28 between October and April, so snow that melts by day can refreeze on lower panel edges overnight. We look at that when we plan a visit.
What a visit involves:
Pricing is simple. Crew time is $110 per person-hour. The trip charge for Mercer Island (zone A) is $200 per dispatch. Our Bothell yard is 35 minutes away.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Trip charge for Mercer Island (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Restored energy production during short winter days; Careful clearing that protects panel glass and warranties; Reduced stress on mounts from uneven snow loads; Managed snow discharge away from walkways and equipment