Keeping You Moving. Beyond Expectations.
We clear asphalt driveways down to the surface and treat them to keep the dark pavement ice-free.
Washington Snow Removal clears asphalt driveways in Mill Creek, WA. Mill Creek averages 8.5 in of snow per season, and 71% of winters bring at least one day of 1 inch or more. Most seasons are light, but the storms that do arrive can be heavy. The biggest single day since 2005 was 7.7 in on Feb 4-5, 2019.
We are licensed, bonded and insured, and we are based in Bothell. Service starts at 1 inch of accumulation. A single-car driveway with front walk and steps starts at $185 per visit. A two-car driveway starts at $275. Call 206-809-9669 to set up service.
Sources: NOAA and National Weather Service records for Mill Creek, 2005–2026.
Asphalt holds heat and clears well, but it is easy to damage if the work is careless. We plow the driveway, and the price includes the front walk and steps. Service starts once 1 inch has accumulated. Mill Creek sees about 2.6 days a year with 1 inch or more, so visits are few, but the storms can be big. Jan 14-20, 2012 brought 15.5 in in total. Feb 13-15, 2021 brought 11.4 in.
Ice is a separate problem. Mill Creek has 35 freezing nights from October to April. Thin snow can melt in the afternoon and refreeze on the pavement overnight. A deicing application starts at $85 per visit.
Pricing options:
Seasonal plans are priced from Mill Creek's snow history, which works out to about 2.57 plow visits in an average season. Visits beyond a plan's limit are half the per-visit price.
Starting prices for Mill Creek. Final price depends on size, slope and snow depth. Mill Creek is in travel zone A.
| Two-car driveway incl. front walk and steps, per visit | from $275 |
| Single-car driveway incl. front walk and steps, per visit | from $185 |
| Deicing application, per visit | from $85 |
| Seasonal plan, two-car (up to 6 visits) | from $850 |
| Seasonal plan, single-car (up to 6 visits) | from $570 |
| Ice plan add-on, per season | from $430 |
Prices approved Oct 2026.
Clears fully to the asphalt surface; deicer chosen to protect the pavement; controls refreeze into black ice; careful edge work to avoid gouging; safe footing through freeze-thaw cycles