Keeping You Moving. Beyond Expectations.
We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Construction sites in Mill Creek do not stop for a light dusting. Mill Creek averages 8.5 in of snow per season, and 35 freezing nights between October and April can leave ice on haul roads, staging areas and walkways long after the snow is gone.
Washington Snow Removal is licensed, bonded and insured, and our yard in Bothell is 9 minutes from Mill Creek. We clear access for crews, deliveries and inspectors. Call 206-809-9669 to set up a dispatch for your site.
Sources: NOAA and National Weather Service records for Mill Creek, 2005–2026.
A job site needs more than a plowed driveway. We clear the gate and entry, the haul route, material drop zones, parking for workers and the walkways to trailers and work areas. Hand crews handle stairs, scaffolding approaches and tight spots where a truck cannot reach.
Mill Creek gets snow in short bursts rather than long seasons. The area sees only 2.6 days a year with 1 in or more of snow, but it has 4.24 light-snow days a year that need deicing. Since 2005 there have been 17 winter storm and heavy snow reports, and about 1.19 Winter Storm Warnings a year. Recent events include Heavy Snow on Dec 26, 2021, and Winter Weather on Dec 1 and Dec 19, 2022. Because the snow is often light and the cold is frequent, ice is the more common problem on site.
Equipment and rates for Mill Creek:
Each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Mill Creek (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones