Keeping You Moving. Beyond Expectations.
We keep marked fire lanes clear during snow events so emergency vehicles always have unobstructed access.
Fire lanes in Mill Creek have to stay open. Apartment complexes, townhome communities and shopping centers rely on them for emergency access, and snow can narrow or block them quickly. Washington Snow Removal clears fire lanes in Mill Creek with plow trucks, compact track loaders and hand crews.
Our yard is in Bothell, 9 minutes from Mill Creek. We are licensed, bonded and insured. Call 206-809-9669 to set up fire lane service for your property before the next storm.
Sources: NOAA and National Weather Service records for Mill Creek, 2005–2026.
Fire lane clearing means more than a pass with a plow. We push snow back so the full width of the lane is open, keep it clear of hydrants and building access points, and avoid piling snow where it blocks the lane again. Tight corners, curbs and parked cars often call for a loader or a crew with shovels.
Mill Creek does not get snow often. The average is 8.5 in per season, and there are about 2.6 days a year with 1 in or more. A plow season averages 2.57 events. That means most properties go long stretches with no snow, then need the lane opened on short notice.
Ice is the more regular problem. There are 35 freezing nights from October to April, and about 4.24 light-snow days a year that need deicing. Thin ice on a fire lane can be as much of a hazard as deep snow. Larger storms do happen. The biggest single day since 2005 was 7.7 in, and spotters near Mill Creek reported 10.5 in on Dec 22, 2008.
Rates for Mill Creek:
There is a 2-hour minimum per dispatch.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Mill Creek (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Fire lanes kept clear to full required width; Support for local fire code compliance; Unobstructed access for emergency responders; Careful clearing that avoids blocking adjacent zones; Reduced liability during winter events