Keeping You Moving. Beyond Expectations.
Keep exterior stairs and landings on your commercial property safe and slip-free through Western Washington ice events.
Commercial Stair Clearing in Mount Vernon covers the steps, landings and handrail approaches that customers and staff use to enter your building. Washington Snow Removal clears them by hand, treats them with ice melt, and leaves a safe path from the walk to the door.
Mount Vernon averages 8.7 in of snow per season, and 71% of winters see at least one 1-inch day. Snow is brief here, but a single storm can make bare concrete steps slick. We are licensed, bonded and insured, and we work from our Bothell yard, 62 minutes away.
Sources: NOAA and National Weather Service records for Mount Vernon, 2005–2026.
Stairs need hand work. A plow or loader cannot get onto steps, so a crew member shovels each tread, landing and ramp edge, then applies ice melt where needed. This is billed at $110 per person-hour.
Mount Vernon sees about 5 days a year with snow on the ground and only 2.6 days with 1 in or more. Most winters are mild. But the area has 37 freezing nights between October and April, and only 2.0 days a year stay below freezing all day. That pattern means thin snow often melts during the day and refreezes on shaded steps overnight. Those refrozen treads are where slips happen.
Big storms do occur. Feb 23-24, 2011 brought 14.8 in in total, with 10.6 in on the biggest day. Dec 21-22, 2008 brought 11.1 in. Jan 15-19, 2012 brought 10.6 in over several days. Stair clearing in a storm like that means repeat passes, not one visit.
What a dispatch involves:
If your property also needs a larger lot or walk cleared, a compact track loader with operator (Kubota SCL1000) is $175 per hour. Call 206-809-9669 to talk through your site.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Mount Vernon (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Hand-cleared treads and landings on every run; Traction material applied the full length of stairs; Attention to handrails and top-and-bottom transitions; Prevention of high-severity slip-and-fall injuries