Keeping You Moving. Beyond Expectations.
We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Construction sites in Mount Vernon do not stop for a few inches of snow, but they can lose a morning to it. Haul roads, laydown areas and gate entries need to be clear before trucks and crews can move safely. Washington Snow Removal plows and treats active sites in Mount Vernon, Skagit County.
We are licensed, bonded and insured, and we work from our Bothell yard, 62 minutes away. Mount Vernon averages 8.7 in of snow a season and 2.57 plow events, so the work is occasional but real. Call 206-809-9669 to set up site service.
Sources: NOAA and National Weather Service records for Mount Vernon, 2005–2026.
A construction site is not a parking lot. Ground is uneven, materials are staged in odd places, and equipment needs room to turn. We plow around that layout and clear the paths people and machines actually use.
Typical work at a Mount Vernon site includes:
Snow here is infrequent. Mount Vernon sees about 2.6 days a year with 1 in or more, and 0.81 Winter Storm Warnings a year. Freezing nights are more common, at 37 between October and April, so ice on shaded ground and standing water often matters more than depth. Big storms do happen. A spotter measured 16 in near Mount Vernon on Feb 24, 2011, and 8.8 in on Dec 27, 2021.
Rates are $250 per hour for a Ram 3500 plow truck with driver, $325 per hour for a Ram 5500 plow and spreader truck, and $175 per hour for a Kubota SCL1000 compact track loader with operator. Crew members are $110 per person-hour. Bulk salt applied is $300 per ton. Mount Vernon is zone C, with a $350 trip charge per dispatch and a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Mount Vernon (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones