Keeping You Moving. Beyond Expectations.

What Would You Like To Find?

Mount Vernon Loading Dock Deicing

Loading Dock Deicing in Mount Vernon, Skagit County, WA - Deicing of loading docks and approaches so freight moves safely when ice forms on the busiest working surface.

Deicing of loading docks and approaches so freight moves safely when ice forms on the busiest working surface.

Loading docks in Mount Vernon get slick fast. Trucks back in, meltwater runs off the apron, and a freezing night turns it to ice. Washington Snow Removal handles deicing at docks, aprons and nearby walks for Mount Vernon warehouses and distribution centers. We are licensed, bonded and insured.

Mount Vernon has 25 warehouses and distribution centers on the map, including Hansen's Furniture Clearance Center, Pacific Power Batteries and Sound Cedar Company. Our yard is in Bothell, 62 minutes away. Call 206-809-9669 to set up service for your site.

Mount Vernon ice season, by the numbers

0ice storm reports logged since 2005
2.67light-snow days that need deicing
3.81Winter Weather Advisories a year
2.6days a year with 1 in or more of snow

Average snowfall by month in Mount Vernon

0.6"Nov
3.2"Dec
1.4"Jan
2.9"Feb
0.6"Mar

Recent winter events logged for the Mount Vernon area

  • Nov 29–Dec 1, 2022: Winter Weather; Heavy Snow
  • Feb 11, 2019: Heavy Snow
  • Jan 16, 2012: Heavy Snow

Sources: NOAA and National Weather Service records for Mount Vernon, 2005–2026.

Loading Dock Deicing at Mount Vernon Warehouses

Dock deicing is mostly about thin ice, not deep snow. Mount Vernon averages 8.7 in of snow per season and only 2.6 days a year with 1 in or more. But it sees 37 freezing nights from October to April, and about 2.67 light-snow days a year that need deicing. Winter Weather Advisories run about 3.81 a year. Our records show 0 ice storm reports since 2005, so the usual problem is a frosty morning or a light dusting on a wet apron.

At a dock, the work usually includes:

  • Spreading salt or ice melt on the apron, dock plates and truck approach
  • Treating walks and entrances where staff and drivers cross
  • Hand work with shovels around doors, ramps and tight corners
  • Plowing when a heavier event hits

Recent events in the area include Winter Weather on Dec 1, 2022, and Heavy Snow on Feb 11, 2019, and Jan 16, 2012. Those are the days when a dock can shut down if the surface is not treated.

Pricing is listed up front. Bulk salt applied is $300 per ton. Bagged ice melt is $45 per 50 lb bag. A crew member is $110 per person-hour, and a plow and spreader truck with driver is $325 per hour. The Mount Vernon trip charge is $350 per dispatch, with a 2-hour minimum per dispatch.

Prices in Mount Vernon

Billed by the hour for the crew and equipment on site, plus materials.

Plow and spreader truck with driver (Ram 5500)$325 / hour
Ice melt, bagged$45 / 50 lb bag
Bulk salt, applied$300 / ton
Crew member (shoveling, sidewalks, hand work)$110 / person-hour
Trip charge for Mount Vernon (zone C)$350 / dispatch
  • 2-hour minimum per dispatch.
  • Mount Vernon is 62 minutes from our Bothell yard.

Prices approved Oct 2026.

Warehouses and distribution centers in Mount Vernon

Mount Vernon has 25 warehouses and distribution centers on the map, each with lots, walks or entrances to keep clear.

  • City of Mount Vernon
  • Hansen's Furniture Clearance Center
  • Pacific Power Batteries
  • Sound Cedar Company

Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.

Loading Dock Deicing in Mount Vernon, Skagit County, WA - Keeps freight moving safely on a high-traffic surface

Service Area

Mount Vernon

County: Skagit County
ZIP Codes Served: 98273, 98274
Neighborhoods: Downtown, College Way, Little Mountain
Nearby Communities: Burlington, Sedro-Woolley, Anacortes, La Conner

Benefits

Keeps freight moving safely on a high-traffic surface; Treats the approach grade where trucks lose traction; Protects steel dock plates and hardware from corrosion; Times application around delivery schedules

Loading Dock Deicing in Mount Vernon, Skagit County, WA - Deice the dock apron and the sloped approach

Loading Dock Deicing in nearby areas

Ready to get started?

Contact us to keep your loading docks safe for freight during cold weather.
Call: 206-809-9669

Get a Loading Dock Deicing Quote in Mount Vernon

Contact Form New