Keeping You Moving. Beyond Expectations.
We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Construction sites in Newcastle sit on hillsides, with gravel access roads, open excavations and staging areas that fill with snow fast. Washington Snow Removal clears them so crews, deliveries and inspectors can get in. We are licensed, bonded and insured, and we work from our Bothell yard, 35 minutes away.
Newcastle averages 7.1 in of snow a season, but the biggest day since 2005 brought 10.2 in on Feb 6-7, 2017. Freezing nights are common, about 30 from Oct to Apr. Call 206-809-9669 to set up service for your site.
Sources: NOAA and National Weather Service records for Newcastle, 2005–2026.
A job site needs more than a cleared driveway. Snow has to come off the haul route, the gate area, the laydown yard and the walkways to the work. Ice has to be treated where workers climb in and out of equipment and where trucks brake on slopes.
Newcastle gets about 2.1 plow events in an average season and about 2.1 days a year with 1 in or more of snow. Most winters are quiet. Then a storm like Feb 13-15, 2021, with 11.5 in total and 7.5 in on the biggest day, stops work for days if access is not cleared. With about 30 freezing nights from Oct to Apr, frost and refreeze matter on steep grades even when no snow falls.
Equipment and rates for a Newcastle site:
Each dispatch has a 2-hour minimum and a $200 trip charge for Newcastle (zone A).
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Newcastle (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones