Keeping You Moving. Beyond Expectations.
Keep raw materials arriving and finished goods shipping by having your plant’s shipping yards, employee lots, and pedestrian routes cleared before each shift.
Manufacturing plants in Pacific, WA run on trucks, shifts and loading docks. Snow and ice on a yard or dock apron can slow all three. Washington Snow Removal plows and treats plant lots, truck lanes and walkways. We are licensed, bonded and insured, and we dispatch from our Bothell yard, 60 minutes away.
OpenStreetMap lists 59 industrial sites inside Pacific city limits, including AmeriGas, Miles Sand and Gravel, Puget Sound Truck Sales and Titan Earthwork. Call 206-809-9669 to talk through your site and how we would plow and treat it.
Sources: NOAA and National Weather Service records for Pacific, 2005–2026.
A plant is more than a parking lot. Trucks need clear lanes, docks need open aprons, and employees need safe walks from the lot to the door. We plan the work around those paths.
Pacific does not get much snow. The average is 6.5 in per season, and only 2.1 days a year bring 1 in or more. The biggest single day since 2005 was 9.2 in. We count 2.14 plow events in an average season, plus 2.67 light-snow days that need deicing. Freezing nights are more common, at 28 between October and April. That means ice is often the bigger issue than depth.
Recent events logged for the Pacific area include Jan 12, 2024 (Cold/Wind Chill), Dec 19, 2022 (Winter Weather) and Feb 12, 2021 (Winter Storm). Since 2005 there have been 15 winter storm and heavy snow reports.
Typical work at a plant includes:
Rates are $250 per hour for a Ram 3500 plow truck and $325 per hour for a Ram 5500 plow and spreader truck. Each dispatch has a 2-hour minimum and a $275 trip charge for Pacific (zone B).
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Pacific (zone B) | $275 / dispatch |
Prices approved Oct 2026.
OpenStreetMap lists 59 industrial sites inside Pacific city limits.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Shipping and receiving yards open for inbound freight; Forklift and yard-transfer routes kept passable; Employee lots cleared ahead of early shift arrivals; Sanded pedestrian crossings to reduce worker injuries; Scheduling aligned to your shift-change windows