Keeping You Moving. Beyond Expectations.
We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Construction sites in Puyallup do not stop for a few inches of snow, but access roads, staging areas and walkways can. Washington Snow Removal, based in Bothell, clears snow and ice from active job sites in Puyallup, Pierce County. We are licensed, bonded and insured.
Puyallup averages 7.8 in of snow a season and 29 freezing nights from October to April. Plow events are few, about 2.4 in an average season, so most of the work is short and has to be done right when it happens. Call 206-809-9669 to set up service.
Sources: NOAA and National Weather Service records for Puyallup, 2005–2026.
A job site has needs that a parking lot does not. Equipment moves in and out, deliveries arrive early, and crews walk on uneven ground. Clearing snow here means opening those paths and keeping them from icing over.
Typical work at a Puyallup site includes:
Puyallup's pattern is mild but uneven. There are only 2.4 days a year with 1 in or more of snow, and 0.57 Winter Storm Warnings a year. Still, heavy snow has hit the area, including Dec 26, 2021, Feb 5, 2017 and Jan 18, 2012. The reports total 11 winter storm and heavy snow events since 2005.
Light snow matters too. About 4.07 days a year are light-snow days that need deicing, and those are the mornings when a frozen site slows the start of work.
Rates are $250 an hour for the Ram 3500, $325 an hour for the Ram 5500 with spreader, $175 an hour for the loader and $110 per person-hour for crew. The trip charge for Puyallup is $350 per dispatch, with a 2-hour minimum. Our Bothell yard is 69 minutes away.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Puyallup (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones