Keeping You Moving. Beyond Expectations.
Deicing of fire lanes to keep emergency access surfaces from glazing over after they have been plowed.
Fire lanes have to stay open and passable, and ice is what closes them in Puyallup. Washington Snow Removal treats fire lanes with deicer so emergency vehicles can get to the building on cold mornings and after freezing rain.
Puyallup sees about 7.8 in of snow a season and 29 freezing nights from October to April. We are based in Bothell, licensed, bonded and insured. Call 206-809-9669 to set up fire lane deicing for your property.
Sources: NOAA and National Weather Service records for Puyallup, 2005–2026.
Fire lane deicing means spreading ice melt along the marked lanes, hydrant access and curb cuts so the surface stays clear of ice. We work with a plow and spreader truck where the lane is wide enough and with crew members on foot where it is not.
Puyallup's pattern is mostly light snow and frost, not long deep freezes. The area gets about 5 days a year with snow on the ground and only 2.4 days with 1 in or more. About 4.07 light-snow days a year need deicing. Only 1.0 day a year stays below freezing, so ice often forms overnight and melts by afternoon. That makes timing matter more than volume.
Freezing rain is the larger risk. Freezing rain was reported 2 Nne Puyallup on Jan 19 and Jan 20, 2012, and sleet was reported 3 Nw Orting on Feb 18, 2018. Pierce County averages 3.38 Winter Weather Advisories a year.
Current pricing:
Each dispatch has a 2-hour minimum. Puyallup is 69 minutes from our Bothell yard, which is reflected in the zone C trip charge.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Trip charge for Puyallup (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Prevents refreeze on plowed emergency-access lanes; Keeps fire lanes code-compliant and passable; Anti-ices ahead of forecast freezing conditions; Uses pavement- and drain-safe materials