How We Clear Bike Lanes in Redmond, WA
Bike lane work is mostly hand work and small equipment. A lane is too narrow for a full-size plow, and pushing snow into the lane from the road is the usual cause of the problem. We clear the lane edge to edge, then treat it if ice is a concern.
Redmond sees about 2.3 days a year with 1 in or more of snow and about 6 days a year with snow on the ground. The bigger risk is ice. There are 31 freezing nights between October and April, so meltwater and slush can refreeze overnight on a lane that looked clear in the afternoon.
Big storms do happen. Feb 11–13, 2019 brought 11.2 in total, with 7.1 in on the biggest day. Feb 12–15, 2021 brought 10.3 in. In storms like those, snow piles up fast along the curb and in the lane.
What the work can include:
- Shoveling and hand clearing of the lane, at $110 per person-hour
- A Kubota SCL1000 compact track loader with operator for heavy piles, at $175 per hour
- Bagged ice melt at $45 per 50 lb bag
Each dispatch has a 2-hour minimum and a $200 trip charge for Redmond (zone A).