Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial Facility Sidewalk Clearing in Redmond covers the walks, entrances and pedestrian paths that workers and visitors use every day. Redmond has 12 industrial sites on the map, including All Wood Recycling and Puget Sound Energy. Each one has walks or doors that need to stay clear.
Washington Snow Removal is based in Bothell, WA, 27 minutes from Redmond. We are licensed, bonded and insured. Call 206-809-9669 to talk through your site and set up service for the season.
Sources: NOAA and National Weather Service records for Redmond, 2005–2026.
Redmond does not get much snow. The average is 7.8 in per season, and snow is on the ground about 6 days a year. Only 2.3 days a year bring 1 in or more. Still, 67% of winters have at least one 1-inch day, so a plan matters even when the totals are small.
Ice is the bigger risk for foot traffic. There are 31 freezing nights from October to April, and about 3.19 light-snow days a year need deicing. Freezing rain has been reported near Redmond, including at Sammamish and Kirkland on Dec 23, 2022, and near Sahalee on Jan 17, 2024. Sleet was reported near Redmond on Nov 29, 2014.
At an industrial facility, the work usually includes:
Pricing is $110 per person-hour for crew members doing shoveling and hand work. Bagged ice melt is $45 per 50 lb bag. The Redmond trip charge is $200 per dispatch, and each dispatch has a 2-hour minimum. A compact track loader with operator (Kubota SCL1000) is $175 per hour if a larger site needs it.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Redmond (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Redmond has 12 industrial sites on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages