We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Construction sites in Shoreline do not shut down for a light dusting, but snow and ice can stop deliveries, trap equipment and make access roads unsafe. Washington Snow Removal clears sites so work can start or resume. We are licensed, bonded and insured, and we dispatch from our Bothell yard, 22 minutes from Shoreline.
Shoreline averages 5.8 in of snow per season, so big storms are rare. When one hits, like the 11.3 in of February 12–15, 2021, a site can sit idle for days without a plan. Call 206-809-9669 to set up service.
Sources: NOAA and National Weather Service records for Shoreline, 2005–2026.
A construction site needs more than a cleared lot. We plow haul routes, gate entries, staging areas and the paths crews walk to reach work areas. Trucks handle open ground. A compact track loader works in tight spots and moves piled snow. Crew members shovel steps, temporary walkways and areas machines cannot reach.
Shoreline sees about 1.7 days a year with 1 in or more of snow, and 0.76 Winter Storm Warnings a year. Most winters bring little. But the pattern is uneven. The biggest single day since 2005 was 7.0 in, and there have been 15 winter storm and heavy snow reports in that time. Ice is the more regular problem: Shoreline has 33 freezing nights from October to April, so wet ground and standing water refreeze on ramps, plywood and slopes.
For that reason we treat as well as plow. Salt or ice melt goes on walkways, ramps and entries where footing matters.
Each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Shoreline (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones