Keeping You Moving. Beyond Expectations.
Deicer restocking keeps bagged and bulk products replenished across your site so no zone goes untreated mid-storm.
Deicer restocking keeps your supply ready before ice shows up. Washington Snow Removal, a licensed, bonded and insured company based in Bothell, WA, refills salt and ice melt for Tacoma properties so the bins are not empty on the one night you need them.
Tacoma sees only 3 days a year with snow on the ground, but it logs 31 freezing nights between October and April. Those nights are when walkways glaze over. Call 206-809-9669 to talk through what your property needs.
Sources: NOAA and National Weather Service records for Tacoma, 2005–2026.
Restocking means we bring deicer to your property and refill what you already use. That can be bulk salt for a spreader or bagged ice melt for entries, ramps and stairs. You decide the product and amount.
Tacoma's pattern shapes how much you need. Only 1.3 days a year stay below freezing, and snow of 1 in or more falls on about 1.6 days. Average snowfall is 5.6 in per season. Most of the risk comes from the 31 freezing nights, plus the occasional event. Heavy Snow was logged on Feb 5, 2017 and Jan 18, 2012, and Winter Weather on Dec 1, 2022. The area also sees about 3.38 Winter Weather Advisories a year, and 2 ice storm reports have been logged since 2005.
Tacoma code (TMC 9.16.050) makes the person in charge of a premises responsible for clearing snow and ice from the public walks in front of or beside it. The deadline is 24 hours. Having deicer on hand makes that easier to meet.
Tacoma is 73 minutes from our Bothell yard. A 2-hour minimum applies per dispatch.
Billed by the hour for the crew and equipment on site, plus materials.
| Bulk salt, applied | $300 / ton |
| Ice melt, bagged | $45 / 50 lb bag |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Trip charge for Tacoma (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Prevents mid-storm shortages at entrances and lots; Covers both bagged and bulk deicer inventory; Scheduled to match each site’s real usage pace; Frees property staff from tracking supply themselves