Keeping You Moving. Beyond Expectations.
Our large equipment fleet takes on major commercial and industrial sites with heavy, sustained snow needs.
Large equipment snow removal in University Place means loaders, plow trucks and spreader trucks sent to clear lots, drives and access roads that hand shovels and small blowers cannot keep up with. Washington Snow Removal is licensed, bonded and insured, and we dispatch from our Bothell yard.
Snow here is rare. The average season brings 5.4 in, and about 1.47 plow events. When it does come, it can be heavy. The biggest single day since 2005 was 7.2 in. Call 206-809-9669 to talk through your property and the equipment it needs.
Sources: NOAA and National Weather Service records for University Place, 2005–2026.
Large equipment work covers properties where the snow is too deep or the area too big for light tools. Think commercial lots, multi-unit parking areas and long private drives. We send a compact track loader, a plow truck, or a plow and spreader truck, each with an operator or driver.
University Place sees about 1.5 days a year with 1 in or more of snow, and 0.57 Winter Storm Warnings a year. Most winters are quiet. A few are not. Storms since 2005 include Jan 15–20, 2012 with 10.8 in total, and Feb 5–6, 2017 with 9.0 in total, including 7.2 in on the biggest day. Jan 11, 2007 dropped 6.5 in in a single day. Snow that arrives all at once is the reason to plan for heavier equipment.
Ice matters too. There are 36 freezing nights between October and April, so melted snow can refreeze on pavement. A spreader truck helps with that.
Rates are listed below:
Each dispatch has a 2-hour minimum. University Place is 82 minutes from our Bothell yard.
Billed by the hour for the crew and equipment on site, plus materials.
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Trip charge for University Place (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Scale to clear the largest properties fast; Coordinated fleet for full-site coverage; Capacity for heavy, sustained snowfall; Planned routes that minimize downtime; Support for critical commercial operations