Keeping You Moving. Beyond Expectations.
Across multiple buildings and shared lots, we coordinate one seamless snow plan so every tenant’s employees arrive to a cleared, salted campus.
Office parks in University Place have many tenants, shared lots and walkways, and staff who arrive at set hours. Washington Snow Removal clears and treats these properties. We are based in Bothell, WA, and we are licensed, bonded and insured.
University Place averages 5.4 in of snow per season, and 36 nights from October to April fall below freezing. That makes ice a bigger issue than deep snow. This page explains what office park service involves here and how we price it.
Sources: NOAA and National Weather Service records for University Place, 2005–2026.
University Place does not see much snow. It averages 1.5 days a year with 1 in or more. Still, the area has had 11 winter storm and heavy snow reports since 2005. The biggest single day in that period was 7.2 in. A spotter in University Place measured 7 in on Feb 13, 2021.
The bigger routine problem is ice. About 2.84 light-snow days a year need deicing, and 36 freezing nights from October to April can leave frost and refrozen melt on walkways and parking lots. Office parks have many entrances, so these spots add up.
Typical work at an office park includes:
Rates are $250 per hour for the Ram 3500 and $325 per hour for the Ram 5500 with spreader. The Kubota SCL1000 loader is $175 per hour. Crew members are $110 per person-hour. Bulk salt applied is $300 per ton. Bagged ice melt is $45 per 50 lb bag.
Each dispatch has a 2-hour minimum and a $350 trip charge for University Place (zone C). Our Bothell yard is 82 minutes away. Call 206-809-9669 to discuss your property.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for University Place (zone C) | $350 / dispatch |
Prices approved Oct 2026.
There are 116 offices and office buildings mapped within University Place.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Whole-campus coordination across shared lots and drives; Building entrances and connecting walks cleared for every tenant; Pre-work timing so employees arrive to safe surfaces; One point of contact for property managers; Consistent service standards across all buildings