Keeping You Moving. Beyond Expectations.
Heavy-duty deicing for industrial sites, keeping truck routes, yard walkways, and equipment approaches safe for round-the-clock operations.
Industrial sites in Woodinville have loading docks, truck lanes, employee lots and entrances that need to stay safe when temperatures drop. Washington Snow Removal provides industrial facility deicing from our Bothell yard, 17 minutes away. We are licensed, bonded and insured.
Woodinville has 8 industrial sites on the map, including Sienna Technologies. Each has lots, walks or entrances to keep clear. Ice is the bigger issue here than deep snow, and we treat surfaces with that in mind.
Sources: NOAA and National Weather Service records for Woodinville, 2005–2026.
Woodinville averages 8.8 in of snow per season, and only 2.7 days a year bring 1 in or more. The more common problem is ice. The area sees 32 freezing nights from October to April and 3.1 light-snow days a year that need deicing. There are about 4.29 Winter Weather Advisories a year. Two ice storm reports have been logged since 2005, including the Dec 23, 2022 ice storm and freezing rain reported at Woodinville and nearby.
At an industrial facility, deicing usually means treating the surfaces where trucks and people move. Typical areas include:
Woodinville code (WMC 12.06.020) makes the owner of property next to a public sidewalk responsible for keeping it safe and free of ice and snow at all times. There is no grace period.
Pricing is simple. Bulk salt applied is $300 / ton, bagged ice melt is $45 / 50 lb bag, and a Ram 5500 plow and spreader truck with driver is $325 / hour. Crew members for hand work are $110 / person-hour. The trip charge for Woodinville (zone A) is $200 / dispatch, with a 2-hour minimum per dispatch. Call 206-809-9669 to set up service.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Trip charge for Woodinville (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Woodinville has 8 industrial sites on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Keeps 24-hour operations safe across every shift; Protects pedestrian crossings within busy vehicle yards; Times treatment to shift changes and delivery windows; Handles large paved areas with industrial-grade product; Guards yard drainage from corrosive runoff