Keeping You Moving. Beyond Expectations.
Keep raw materials arriving and finished goods shipping by having your plant’s shipping yards, employee lots, and pedestrian routes cleared before each shift.
Washington Snow Removal clears snow and ice from manufacturing plant properties in Woodinville. Our yard is in Bothell, 17 minutes away. We are licensed, bonded and insured. Call 206-809-9669 to set up service.
Woodinville averages 8.8 in of snow per season, and the biggest single day since 2005 was 7.4 in. Snow is not frequent here, but plants still need clear docks, lots and walkways when it comes. Freezing nights, 32 from Oct to Apr, bring ice that is often the bigger problem.
Sources: NOAA and National Weather Service records for Woodinville, 2005–2026.
A manufacturing plant has different needs than an office lot. Trucks come and go, shifts change, and loading areas must stay usable. Our work usually covers the following:
Woodinville sees about 2.7 days a year with 1 in or more of snow. Reports of winter storms and heavy snow number 27 since 2005. Recent events were logged on Dec 1, 2022, Feb 12, 2021 and Jan 12, 2020. Because big snow days are rare, ice from the 32 freezing nights often matters more than depth. Meltwater that refreezes near docks and walkways is a common hazard.
Pricing is listed up front. A Ram 3500 plow truck with driver is $250 per hour. A Ram 5500 plow and spreader truck is $325 per hour. A Kubota SCL1000 loader with operator is $175 per hour. Crew members are $110 per person-hour. Bulk salt applied is $300 per ton. Bagged ice melt is $45 per 50 lb bag. The Woodinville trip charge is $200 per dispatch, with a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Woodinville (zone A) | $200 / dispatch |
Prices approved Oct 2026.
OpenStreetMap lists 8 industrial sites inside Woodinville city limits.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Shipping and receiving yards open for inbound freight; Forklift and yard-transfer routes kept passable; Employee lots cleared ahead of early shift arrivals; Sanded pedestrian crossings to reduce worker injuries; Scheduling aligned to your shift-change windows