Keeping You Moving. Beyond Expectations.
We safely remove accumulated snow from residential and light commercial roofs to protect against structural overload.
Woodinville does not get snow often, but when it comes in heavy, roofs take the load. Washington Snow Removal clears snow from roofs in Woodinville, with crews dispatched from our Bothell yard, 17 minutes away. We are licensed, bonded and insured.
Roof work is done by hand. Crew members shovel and clear the snow, then handle the ground below so it does not pile up at doors and walkways. Call 206-809-9669 to talk through your roof and set up a visit.
Sources: NOAA and National Weather Service records for Woodinville, 2005–2026.
Woodinville averages 8.8 in of snow per season. Most winters are mild. The area sees about 2.7 days a year with 1 in or more of snow, and only 0.48 heavy-snow days a year of 4 in or more. That means roof snow is an occasional problem, not a monthly one.
When it does arrive, it can be significant. Spotters near Woodinville reported 10.5 in at 2 E Woodinville on Feb 9, 2019, and 9.5 in at Woodinville on Feb 4, 2019. On Feb 14, 2021, Kingsgate reported 9.4 in and Bothell 9.3 in. The biggest single day since 2005 was 7.4 in, and the snowiest season on record here, 2008-09, reached 35.9 in.
There are also 32 freezing nights from Oct to Apr. Cold nights after a snowfall can keep snow on a roof and refreeze it, so clearing it early matters.
A roof visit typically involves:
Pricing is straightforward. Crew members are $110 per person-hour for shoveling, sidewalks and hand work. The trip charge for Woodinville (zone A) is $200 per dispatch.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Trip charge for Woodinville (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Reduces the risk of structural overload from heavy wet snow; prevents collapse during rain-on-snow events; avoids shingle damage by leaving a protective snow layer; balances load removal to protect the structure