Keeping You Moving. Beyond Expectations.
We rapidly clear the critical routes people need to enter and exit your property safely during a snow emergency.
Emergency access clearing in Yarrow Point means opening a path so people, deliveries and emergency vehicles can get to a home. That usually means a steep driveway, a private lane or a gated entry. Washington Snow Removal is licensed, bonded and insured, and we dispatch from our Bothell yard, 25 minutes away.
Snow here is rare. The average is 5.4 in a season, but a storm like Feb 14, 2021 can leave 11.8 in, as a spotter measured 1.4 NE of Seattle. When that happens, call 206-809-9669.
Sources: NOAA and National Weather Service records for Yarrow Point, 2005–2026.
Yarrow Point sees about 1.7 days a year with 1 in or more of snow. Heavy-snow days of 4 in or more are rarer still, at 0.17 a year. Most winters give little to plow. When a big storm does come, such as the 11.1 in a spotter measured in Bellevue on Feb 9, 2019, few properties are ready for it.
Emergency clearing is about getting access open, not a perfect finish. On a typical Yarrow Point lot, the work can include:
Ice is the bigger regular concern. The area has 28 freezing nights from October to April, so meltwater can refreeze on shaded slopes and curves even when little snow falls.
Pricing is by the hour. A Ram 3500 plow truck with driver is $250 per hour. A Ram 5500 plow and spreader truck is $325 per hour. A crew member for hand work is $110 per person-hour. Bagged ice melt is $45 per 50 lb bag, and bulk salt applied is $300 per ton. The trip charge for Yarrow Point (zone A) is $200 per dispatch, and each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Yarrow Point (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Priority clearing of essential entry and exit routes; Maintained connection to public roadways; Support for safe evacuation if needed; Reduced risk from a snowed-in property; Fast focus on the highest-stakes areas first