Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Washington Snow Removal clears sidewalks, walks and entrances at industrial facilities in Federal Way. Federal Way has 29 industrial sites on the map, including Campus Park, Corliss Resources, Fire Station 62 / Headquarters and Ninth Avenue Center. Each one has walks and entrances that need to stay passable.
We are based in Bothell, WA, and we are licensed, bonded and insured. Federal Way is 60 minutes from our yard. Call 206-809-9669 to talk through your site and how we would handle it.
Sources: NOAA and National Weather Service records for Federal Way, 2005–2026.
At an industrial facility, sidewalk clearing means the walks people use every day: employee entrances, door landings, paths from parking to the building and public sidewalks along the property line. Crews shovel by hand, and we can bring a Kubota SCL1000 compact track loader with operator for larger areas. Ice melt is applied where needed.
Snow is not frequent here. Federal Way averages 6.0 in per season and has snow on the ground about 4 days a year. Only 1.8 days a year bring 1 in or more, and 67% of winters have at least one such day. The bigger recurring problem is ice. There are 28 freezing nights from October to April, and freezing rain was reported near Federal Way on Dec 23, 2022 and Jan 19, 2012. A thin glaze on a shaded walk can matter as much as a snowfall.
Federal Way code (FWRC 4.40.040) makes the owner, lessee or occupant responsible for removing snow and ice from the sidewalk in front of or next to the property. The deadline is 24 hours.
There is a 2-hour minimum per dispatch.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Federal Way (zone B) | $275 / dispatch |
Prices approved Oct 2026.
Federal Way has 29 industrial sites on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages