Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial Facility Sidewalk Clearing in Milton covers the walks, entrances and pedestrian paths that workers use to get from parking to the door. Milton has 22 industrial sites on the map, including Bridge Point I-5. Each one has walks that need to be clear and safe underfoot.
Washington Snow Removal is licensed, bonded and insured, and we work out of our Bothell yard. Milton averages 6.1 in of snow a season, so most of the work is short, sharp events and icy mornings. Call 206-809-9669 to set up service.
Sources: NOAA and National Weather Service records for Milton, 2005–2026.
At an industrial facility, the sidewalk work is hand work. Crews shovel walks, clear entrances and spread ice melt where people and carts cross. Where a site has long runs or heavy drifts, a compact track loader with operator can help clear the larger areas.
Milton does not see much snow. It averages 6.1 in per season, and only 1.9 days a year bring 1 in or more. Snow is on the ground about 4 days a year. The bigger issue is ice. There are 28 freezing nights from October to April, and about 3.95 light-snow days need deicing. Freezing rain has also been reported near Milton, including Dec 23, 2022 at 1 S Federal Way and Jan 2012 reports near Puyallup and Summit. A thin glaze on a walk can matter more than a few inches of snow.
Milton is 66 minutes from our Bothell yard, so the pricing reflects that distance. Current rates:
Each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Milton (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Milton has 22 industrial sites on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages